Interim Measures

  • View of the IM-3 treatment plant looking south
  • Workers connect drop pipe during installation of new pump at extraction well PE-01, March 2012.
  • Installation of the new pump at PE-1, March 2012
  • Work done to Replace the pump at extraction well PE-1, March 2012. Photograph of new pump prior to installation
  • Work done to Replace the pump at extraction well PE-1, March 2012
  • Work done to Replace the pump at extraction well PE-1, March 2012.
  • Current Topock Site photograph looking south/southeast towards IM-3 Treatment Plant (2013)
  • View of the MW-20 bench during IM-2 groundwater extraction activities, May 2004
  • Current Topock Site photograph looking north towards IM-3 Treatment Plant (2013)
  • IM-1: Installation of MW-36 floodplain wells, April 2004
  • Logging core samples from IM-1 well drilling
  • IM-1: Installation of floodplain monitoring wells, March - May 2004
  • IM-2: Protective berms and ground liners at the MW-20 bench
  • MW-20-100 monitoring well with old extraction and containment system, 2004
  • View of the MW-20 bench during IM-2 groundwater extraction activities, January 2005
  • Braced framework of the Storage Tank foundation, November 2004
  • IM-3 batch treatment chemical containers at the MW-20 bench in 2004.
  • Groundwater extraction from the MW-20 monitoring wells, March 2004
  • IM-2 water transport trucks arrive and depart from MW-20 bench, circa 2004-2005
  • Setting T-700 (treated water storage tank) at the IM-3 treatment plant, January 2005
  • Setting tanks T-100 (raw water storage) and T-700 (treated water storage) at the IM-3 treatment plant, January 2005
  • View of the IM-3 Treatment Facility from the Topock Compressor Station
  • Construction of the Topock IM-3 Treatment Plant, January 28, 2005
  • View from South toward the IM-3 Treatment Facility, February 2006
  • Construction of the Topock IM-3 Treatment Plant, January 19, 2005
  • Construction of the Topock IM-3 Treatment Plant, December 17, 2004
  • IM-3 Treatment Facility after construction activities are completed, circa 2006
  • Construction of the Topock IM-3 Treatment Plant, July 2005
  • Construction of the Topock IM-3 Treatment Plant, April 2005
  • Construction of the Topock IM-3 Treatment Plant, March 9, 2005
  • Construction of the Topock IM-3 Treatment Plant, March 21, 2005
  • Construction of the Topock IM-3 Treatment Plant, February 2005
  • Construction of the Topock IM-3 Treatment Plant, December 11, 2004
  • Construction of the IM-3 Treatment Plan, January 2005
  • Water level monitoring during testing at injection well #3, date unknown
  • Preparing to install injection well #3 casing
  • Drilling of injection well #3 at night
  • Compliance well installation in the injection well field
  • Drilling a Compliance well.
  • Placing Sand Cover on Electrical Conduits, December 2004
  • HDPE Pipe Installation: Laying the pipe after fusing sections together
  • Two HDPE fusion machines working in tandem fusing 40-ft sections of 4'x8' double wall pipe, November 2004